Heavy equipment is often designed, procured and manufactured long before anyone asks how it will reach site. By the time the question is asked, the options are limited and expensive.
The route decides more than people expect
Road width, turning radii, overhead clearances, bridge capacities, ferry crossings and seasonal flooding all shape what can be delivered and when. In Bangladesh, the same route can behave very differently in the dry season and the monsoon.
Questions to ask early
- What is the heaviest and the largest single piece, as shipped?
- Can it be shipped in sections and assembled on site?
- Which ports, border crossings and inland routes are realistic for this size?
- Which bridges and structures on the route need assessment?
- What lifting capacity is needed at every transfer point, and can the ground support it?
- What permits, escorts and movement windows apply?
The cost of answering late
When these questions are answered after the equipment is built, projects pay for it in temporary works, route modifications, waiting time and risk. When they are answered at the design stage, they shape shipping dimensions, lifting points and delivery schedules at almost no cost.
A single owner for the journey
The most reliable movements have one coordinating party who owns the plan end to end — from factory to foundation — and keeps manufacturer, logistics provider, crane contractor and receiving site working to the same schedule.
Our experience with heavy machinery and rail rolling-stock movements has made this our standard approach: plan the journey as carefully as the installation.